FXP_0260
Many lives were lost as numerous tunnels and bridges were built. 15 hand-made tunnels and 37 bridges were built to climb from sea level to 328 meters up the Macalister Range. Three million cubic meters of earth had to be excavated during construction.
NIKON CORPORATION NIKON D700, f/5.6 @ 38 mm, 1/500, ISO 200, No Flash
© 2013 Fred Henstridge Photography